While under construction to provide water power for mills on the Mississippi River around St. Anthony, a tunnel under Hennepin Island gives way. The 2,000-foot collapse threatens to divert water from the main falls and cut the power source for mills along the river. Local citizens work to plug the hole until the river freezes, and then a dam is built to allow for more permanent measures. The repair job would require ten years to complete.